Gradex Consulting Ltd. - Residential Lot Grading Coordinators serving the City of Edmonton and surrounding communities since 2001.
REQUIREMENTS - CITY SIDEWALKS

Backfill at Back of Concrete Walks or Paved Lanes

To reduce water infiltration into the granular base of concrete walks and paved lanes, non-granular backfill must be placed to the top (surface) of the concrete or asphalt. This will enhance the long term performance of the walk or lane by minimizing water infiltration through the granular base.

The following diagrams and pictures illustrate the typical clay cap with sidewalk (
for reference only):

Typical Clay Cap with Sidewalk at Rough Grade Design
 
Existing Clay Cap with Sidewalk at Rough Grade Stage
 
Typical Clay Cap with Sidewalk at Final Grade Design
 
Improper grading generates ponding during the rain
Content provided by the City of Edmonton Copyright © 2011 City of Edmonton.  All rights reserved.

Copyright 2002-2011 Gradex Consulting Ltd.  All Rights Reserved           Home | Careers | Privacy Policy