Gradex Consulting Ltd. - Residential Lot Grading Coordinators serving the City of Edmonton and surrounding communities since 2001.
RESIDENTIAL LOT GRADING - APPROVAL PROCESS

At two stages during construction, the builder or homeowner is required to have the lot inspected for grading approval.  To make sure the house and lot are constructed in accordance with all requirements, you should be familiar with the procedure for both the rough grade and final grade stages.

In new subdivisions, developers often require a refundable deposit to ensure conformance with the Lot Grading Plan and architectural guidelines.  Inquiries about deposits or architectural guidelines should be directed to the homebuilder or developer.

FEES

Inspection fees are levied only to cover the cost of inspection requirements.  These fees are collected at the Planning and Development Department when you apply for the building permit.

  • Single detached housing:  $120

  • Semi-detached (duplex) housing:  $120 per unit

Complete fee information is outlined in the Surface Drainage Bylaw.

 

Finished landscape
Related Documents

To view these documents, you must have the Adobe Reader installed on your computer.  If you don't already have this FREE reader, click the link below and install it now.

Content provided by the City of Edmonton Copyright © 2011 City of Edmonton.  All rights reserved.

Copyright 2002-2011 Gradex Consulting Ltd.  All Rights Reserved           Home | Careers | Privacy Policy